Repair of the seabed reinforcement of quay 14 at Muuga Harbour
Repair of the seabed reinforcement of quay 14 at Muuga Harbour
Project type
Repair, Strengthening
Location
Estonia, Muuga
Project start date
04.2023
Project end date
06.2023
Repair of the seabed reinforcement of quay 14 at Muuga Harbour
Project type
Repair, Strengthening
Location
Estonia, Muuga
Project start date
04.2023
Project end date
06.2023

Supply and installation of the reinforced concrete slabs and gabions in the design position, elimination of erosion under the seabed reinforcement structure

Repair of the front wall of quay LHC at Länsi Harbour
Repair of the ramp-side wall of quay No 4 at Paldiski South Harbour