Repair of the copper dome, restoration of the flange, repair of the glazing, corrosion protection and painting of metal details, restoration of the interior walls of the lantern room, restoration of the viewing platform railings
Repair of the flange joint between the lantern room and the tower, repair of the glazing, corrosion protection and painting of the metal details, restoration of the interior walls and ceilings of the lantern room, repair of…
GT Corporation SE has completed engineering and technical works on reconstruction of Support pier at Muuga port, Estonia. Damaged structures have been repaired, coating constructive elements have been replaced and the end face has been reconstructed.
GT Corporation SE & GT Est OÜ have completed the repair and reinforcement of metal piles and reconstruction of concrete heads of pier 1A of Muuga Port, Estonia. The bridge between dolphins 6 and 7 has also been reconstructed.
GT Corporation SE completed construction works on the ferry loading ramp at the 16th Pier of Vanasadam port in Tallinn, Estonia. The ramp has dimensions of 31m x 28.5m and is dedicated to loading and unloading vehicles up to…