Elimination of erosion under the front sheet pile wall, repair and corrosion protection of the front
wall, strengthening of the piles at the seabed level, repair of the reinforced concrete front beam
Repair of quay No 6 at Paldiski South Harbour, 2nd stage
Project type
Repair, Corrosion protection
Location
Estonia, Paldiski
Project start date
03.2022
Project end date
10.2022
Repair of quay No 6 at Paldiski South Harbour, 2nd stage
Project type
Repair, Corrosion protection
Location
Estonia, Paldiski
Project start date
03.2022
Project end date
10.2022

